News
Emergency Response to Storm Babet’s Disruption
18/12/2023
Over a 3 day period during October Storm Babet wreaked havoc across the UK delivering over 100mm of rain in places, which resulted in severe disruption to several major aspects of life across many areas of the country, with loss of electrical supplies and some catastrophic failures being just one.
Read moreWelcoming Samantha Collishaw and Reducing Carbon Footprint
12/10/2023
EME Power Systems has been trying to look at ways of reducing our Carbon Foot Print and improving our efficiency.
With nearly 700 maintenance contracts across the UK our process involves a lot of driving and a large amount of paperwork, creating job cards and instructions for the routine and full maintenance we carry out.
Running these is takes a lot of time and effort as well as the office side of things with printing and paperwork.
Read moreArdagh Glass Transformer Replacement
30/09/2023
EME Power Systems recently completed a transformer replacement project at Ardagh Glass in Doncaster. The works involved the replacement of 2No. existing transformers with 2No. new 3MVA Cast Resin transformers. The time frame of the project was extremely tight, with one of the transformers needing to be energised to ensure production could begin as soon as the new furnace was completed.
Read moreConsidering Voltage Management to Help Cut Bills?
15/08/2023
Voltage management comes in many technologies and is just one element of improving energy efficiency but, if considering voltage management to help cut electricity bills, quite often one of the lowest cost options gets overlooked and you may already have the equipment to achieve a voltage reduction to site in place.
Read moreGraham Haydn-Davies Retirement
2nd June 2023
EME Power Systems said goodbye on 24th May to long standing employee Graham Haydn-Davies as he left to enjoy his well-earned retirement.
Read moreLV Sub-Main Fault
23/03/23
EME Power Systems received a call from a customer asking us if we could help to investigate an ever increasing intermittent tripping problem on a parallel feeder circuit from an LV MCCB.
Read moreCable Joint Failure
26th January 2023
On Saturday 26th November our Incident Manager, Steve Myson received an emergency call from Eat Real in Nuneaton. The site was reporting a total loss of supply to site and National Grid (formerly Western Power Distribution) were confirming that there were no issues on the local distribution network and that the problem was within the private network belonging to Eat Real. Steve dispatched an engineer to site to commence fault finding.
Read morePhil Shaw Retirement
10th January 2023
EME Power Systems wish Phil Shaw all the very best in his retirement.
Read more